Archive for the ‘Kingsbridge ll’ Category

Wind farm opponents turn up heat – Wind Concerns Ontario

October 31, 2008

Editor:

I’m going to go through this article by Tyler Hamilton and critique it. I’ll include some of my experiences and thoughts as well. My critique will be added in italics. Having spent over two years studying wind farms, having read and studied thousands of pages of documents from around the world, attending many council meetings and an OMB hearing, I believe I’m qualified to discuss the subject in an objective manner.

Ron Stephens

Wind farm opponents turn up heat

Province wary of small but effective groups as it aims to beef up renewable energy plan.
Oct 30, 2008 04:30 AM

Energy Reporter Toronto Star( Shill for the wind industry – I say that because of his absolute lack of objectivity)

Opponents to wind farms in Ontario, at the best of times a local thorn in the side of wind-energy developers, have suddenly realized the benefit of getting organized.( see what I mean )Earlier this week a new anti-wind group called Wind Concerns Ontario, a coalition of 22 small rural groups each fighting their own community battles, announced its creation as a “strong, unified voice of opposition” to provincial plans that would see thousands of industrial wind turbines “tearing apart the very fabric of rural Ontario.”
They emphasize the “industrial” nature of wind turbines and their danger to birds and bats. They say the machines are noisy, make some people sick, kill local tourism and cause the real estate values of surrounding properties to fall. (All true statements, backed by facts)
Wind turbine noise affects health

Homeowners living near windfarms see property values plummet)

When those complaints don’t stick, they attack the technology as being a fraud. “It does not in reality produce `green’ energy, does not reduce CO2 emissions significantly and is inefficient,” said Beth Harrington, spokesperson for the new coalition and head of the Alliance to Protect Prince Edward County, where several onshore and offshore wind projects are being planned.

(True – Wind energy has been promoted as being able to significantly reduce emissions, even though there is no evidence to support the claim.)

The increasingly vocal opposition, however small compared to those who more quietly support wind power in Ontario, isn’t lost on the Liberal government, which is counting on new renewable-energy projects as part of a plan to wean the province from coal-fired power generation by 2014.

(The so-called “quiet support” comes from people who got sucked in by the propaganda machine or never did any research on the subject)

In September, Energy and Infrastructure Minister George Smitherman directed the power authority to beef up an already ambitious renewable-energy plan, much of it dependent on massive new wind farms being erected across the province and on the Great Lakes.

(George Smitherman just recently took over the Ministry of Energy. So the question that needs to be asked is – What does Smitherman actually know about the energy needs of Ont. From his actions so far I feel safe in saying – not much. As Health Minister he thought it was prudent to have our seniors sit in dirty diaper until they were 70% full)

Smitherman, who will be in Shelburne today opening Canada’s largest wind farm, told the Star he’s committed to engaging the public in meaningful discussions as the plan moves forward. “But we also recognize that work needs to be done to ensure that momentum on the goal of a cleaner and green energy future isn’t diminished.”

(Meaningful discussions should be read as – drink the Kool-Aid or we’ll call you names ie: Nimby’s. That does not constitute meaningful discussions. He also forgot to mention the people already forced to move as a result of the first phase of the project)

This will require a streamlining of rules and regulations so they better balance community concerns with the need to move projects forward, industry observers say. A practical start, some suggest, is to establish environmental pre-screening of projects to weed out the good from the bad.

(This should read – The govt. and wind industry will decide where wind farms go and local councils will be bypassed.)

Behind the scenes the government is working on such improvements, sources say, including the creation of a Green Energy Act that would give priority to renewable energy and conservation as the province updates and expands its electricity system.

(Read – end of local democratic rights)

Some have grown impatient. EPCOR Utilities Inc. earlier this month canceled a $300-million wind farm in Goderich. After years of delay, the company said it couldn’t wait any longer for provincial and municipal approvals, which in some cases had been slowed by a handful of protesters.

( I attended many council meetings concerning the Epcor-Kingsbridge ll wind farm near Goderich and I never saw a protester. I did meet people who were lied to in order to construct Kingsbridge l . People who suffered from health, noise and stray voltage problems. I saw Epcor  walk out of council  meetings twice  and say they were done. Why? Because people wanted answers to questions that the wind company couldn’t or refused to answer.

They should have left, but the govt. kept saying they would fix things. I saw junk engineering reports – anything to try and ram the project through. I believe there has been a formal complaint lodged because of those engineering reports.

We, a small group of dedicated citizens, farmers and landowners, including one dedicated councilor held up Kingsbridge ll for over a year. In that time I witnessed what can only be described as total and complete disrespect for people, their rights, their health, their property and the truth.

In the end a 450 meter setback was adopted – the same setback that was put forward over a year earlier, even though the people suffering ill effects from Kingsbridge l were all outside the 450 meter setback. The councilor who stood up for his constituents said “I was told  by lawyers that any setback over 450 meters would prompt an OMB hearing at a cost to the township of $100.000 and that we would lose.”

Epcor recently released a statement stating they were withdrawing from the Kinsbridge ll wind farm because they would be unable to have the project up and operational by Oct.31st. of this year. They had to know that at least a year ago – so what gives?

This is speculation on my part, but I believe the Epcor withdrawal will be used as the excuse the govt. has been looking for to bypass local councils.

So much for democracy!)


Closer to home, Toronto Hydro got a taste of things to come this week as it considers construction of an offshore wind farm off the Scarborough Bluffs. It was forced on Monday evening to cancel its first community information meeting because more than 400 people showed up – twice as many as the church hall could hold.

Nearly 200 people lined up outside were greeted by someone from a group called SOS Windfarms Toronto (the SOS stands for Stop Offshore) who was handing out business cards that promote a website.

Along with some valid concerns, the site also contains misleading or wrong information, such as claims that the wind farm is being promoted as the only green solution for Toronto and that 80 years of aviation data show the site is inappropriate for wind generation.

(If you want misleading or wrong information go to the CanWEA site or the Govt. of Ont. site,or read the writing of Tyler Hamilton. They are masters of the art.)

“I think a lot of people are making judgments based on information that I would say is incorrect,” said Keith Stewart, an energy expert with WWF-Canada. “Rational argument can win over the majority, but it can’t win over everyone.”

(There goes Tyler Hamilton again – describing Keith Stewart of the WWF as an energy expert. Keith Stewart has a PhD in political science from York University, where he studied environmental politics. I see nothing that would suggest he is an energy expert.

I thought the focus of the WWF was trying to save the ‘not endangered polar bear’. Maybe Mr. Stewart would be of more use in the high arctic.

I want to hear from the engineers – the people who understand and build electrical systems,  not politicians and lobby groups)

Stewart said some ecologically sensitive locations are clearly not appropriate for wind farms, and that’s part of the reason why government has to create guidelines.

Full article at Toronto Star

(It was CanWEA that requested the govt. not impose setbacks and the govt. agreed to the request.)

First, the relatively small size of private land parcels in Ontario will present a challenge for developers due to the number of stakeholders that may perceive impacts. Windpark development may become uneconomical if municipal setbacks created to address these “perceived” concerns reduce the usable land area, thus eliminating the economics of scale necessary to develop a project.*
*14c) The Industry does not recommend that a set of standard bylaws be adopted with respect to setbacks or other municipal zoning issues.*

(*”The above can be understood to mean, that if “safe setbacks” are mandated, it will make it uneconomical to site wind farms in Southern Ontario”)

(If Tyler Hamilton, the Govt. or CanWEA think they can subdue the rising state of awareness concerning the reality of wind farms, they are mistaken in their misguided belief, just as they are being dishonest when telling the public that wind farms will significantly cut CO2 emissions or are capable replacing a fossil fuel plant.

During a conversation I had with the senior policy adviser for the Ministry of Energy, I mentioned that  my research suggested the best plan for Ontario’ s electrical needs was to put the scrubbers on the coal plants and build a nuke. He agreed with my assessment.  Cost -10 billion for a system that is both environmentally sound and cost effective. McGuinty has continually refused to put the scrubbers on the coal plants, putting the health of thousands at risk)

McGuinty’s plan – 60+ billion for an unstable, overly expensive and is no healthier than the one proposed by myself and  accepted as sound by the policy adviser.

When I asked why this was happening, he answered “politics” – try heating your home with politics.)

Premier, Dalton McGuinty Talks About Renewable Energy For Ontario

Premier, Dalton McGuinty powers a press conference with wind energy

South Algonquin declares moratorium on wind farms; No turbines to be built for 10 years, council says

October 22, 2008

Editor: Ever since I got involved in the STOP THE WINDMILLS fight, 2 years ago, I’ve continually said that it would be the folks in the eastern part of Ontario that would be the ones to show the way for the rest of the province. The people of the Ottawa Valley still know what’s important!

I salute the council!

To the councils in SW Ontario – it’s time you stood up for your constituents. The time has come to stop rolling over to the whims of the wind industry and the govt. Take a trip to Eastern Ontario, borrow some backbone and stand up for your constituents.

You don’t do this to your friends and neighbors!
Not for any amount of money

Enbridge wind farm Kincardine Ontario

Enbridge wind farm Kincardine Ontario

South Algonquin declares moratorium on wind farms; No turbines to be built for 10 years, council says

No wind-powered energy projects will be approved in South Algonquin for the next 10 years, the township’s council has declared.

The declaration, which was supported unanimously by councillors, came last Thursday night following a council meeting considering a proposal to construct a series of wind-power turbines in the hills along the Highway 60 corridor.

RES (Renewable Energy Systems) Canada wants to build 40 to 60 of the massive wind-power turbines in the area east of Algonquin Park. The plans, particularly for the construction of several of the turbines around pristine McCauley Lake, are unpopular with many seasonal and year-round residents. Several opponents of the project were present at the meeting, and gave a short presentation.

Cottager Brent Peterson, representing “the McCauley Lake Families,” said the 45 families on the lake just east of Algonquin are “the only community directly within the Whitney Wind farm study area.”

“We are united as a community, and we are asking for your protection,” he told council. The cottagers are asking that RES be required to locate its turbines, currently planned for the hills in full view of the quiet lake, out of sight and hearing distance from the lake. The PowerPoint presentation showed photographs of the lake’s vista, along with enhanced pictures showing what that vista would look like with wind turbines erected on the surrounding hills.

“These things are massive and they will completely change the experience of living on the lake,” Peterson said. “Your constituents are extremely anxious and very upset.” Peterson added that the McCauley Lake residents “know this is a big decision and that there are a lot of dollars involved.” But he said many of the people are considering leaving the area, or putting off plans to retire to their cottages if the turbines are built.

Harvey Leeman, a longtime Ontario Hydro employee and a McCauley Lake resident since 1949, and a hunter and fisherman as well as a forest manager, questioned both the assessed impact of the wind turbines on wildlife and the need for the electricity they will produce.

The RES proposal wants to take over “the heart of the last block of public land” in the Algonquin Park area, Leeman said. He pointed out that, while the company says each turbine has a one-acre footprint, “they want 6,000 acres of Crown land” for the project.

He pointed out that there are few local benefits from the turbines, either in jobs or in significant tax income and said RES estimates of job creation and local benefits come with heavy qualifications and are “greatly exaggerated.” The estimated $150,000 in tax income for South Algonquin would be lost in the decreased property values that the turbines would cause, he charged.

After the presentation, Councillor Richard Shalla presented a motion, seconded by Councillor Joe Florent, that would impose a moratorium on wind turbine approvals. After some discussion, the motion was amended to set the 10-year period, and a provision was added for a township-wide referendum on wind turbines, if council deems it necessary.

The motion was approved unanimously, and sparked loud and prolonged applause from the small group of people in the audience.

“I’ve been at council a long time and I’ve never had people clap for me,” Mayor Percy Bresnahan said, sparking laughter throughout the room.

Stephen Cookson, development manager for the RES Canada project, said he understands the reasoning behind the township’s move. He said RES remains committed to its plans.

“This is a very, very long process and we’re at the very beginning of the environmental assessment process.” He added that RES is confident that once the benefits of the project are understood by the community and council, “they will see it in a better light.” The company will hold more open house meetings, probably in the spring or summer of next year, to keep the public fully informed, Cookson said in a telephone interview from Vancouver. He stressed that RES wants to maintain “an open dialogue with the community of South Algonquin.”

“I think South Algonquin is being very prudent in waiting until all the information is in concerning the project. We hope that council will take as good a sounding as is possible” on the proposal.

Barry’s Bay This Week

22 October 2008

Windmills vs. NIMBYism – Toronto Star -Propagandist For the Wind Industry

October 20, 2008
Update: Response I received from the Toronto Star editorial board when I asked questions about one of their editorials. (found below)
If you live in rural Ontario you may want to consider canceling the Toronto Star. They’ll take your money but they won’t recognize you.

Response to my letter to the editorial board of the Toronto Star. If you live in the country you count for nothing.

Dear Mr. Stephens:
The “community” I am referring to is the Star’s community of readers.
Given that the Star is considered “the voice of the GTA” this would be
the community of readers in Toronto and the Greater Toronto area.
Certainly, many people in many communities would disagree with the views
put forward in this editorial opinion (as will any editorial). That is
their prerogative, as it is yours.
I will not be taking any further action on this editorial; nor will I be
providing you will “verification’ of the research done by the Star’s
editorial board as that is certainly not our practise.
I think the arguments put forward in the editorial speak for themselves
and it is beyond the scope of my role to question the conclusions drawn
in Star editorials.
As I told you, an editorial is an opinion based on the editorial board’s
interpretation of the facts at hand. While you may hold another opinion
I see no value in our debating these facts. I am not going to change
your mind about this issue and the Star’s editorial board is not likely
to reverse its position on this issue at this point in time.
Regards,
Kathy English

Kathy

I would like you to verify the research done and the content of the
research.

“This editorial view was arrived at after much research, thought and
debate by members of the Star’s editorial board, a group of six
journalists, under the direction of Editorial Page Editor Ian Urquhart,
who are charged with the responsibility of determining and expressing
the Star’s position on important matters affecting our community.
Because editorials represent the institutional voice of the newspaper,
they are never signed by the individuals who write them”.

I would also like someone to explain who’s community the article is
referring to.
I know many people, in many communities who would strongly disagree with
the position of the editorial board of the Toronto Star, including the
senior policy adviser for the Ministry of Energy and the ex-CEO of the
OPA.

I have invited the Provincial govt. to go through the information on my
site and point out any inaccuracies. To date, even though they are on my
site daily, they have never questioned or requested any changes.
I therefore request that your editorial staff go through my site as
well.

I want to know how they came to their conclusions.

The editorial board must be able to justify their position or it could
be considered propaganda.

Regards

Ron Stephens

Editor: The first casualty of war is TRUTH.
There is a war being waged against the rights of the citizens of Ontario by the environmental movement and the Toronto Star has become a propagandist for the movement.

1. a person involved in producing or spreading propaganda.
2. a member or agent of a propaganda.
Dictionary.com Unabridged (v 1.1)Cite This Source
I added the name of the writer to this article. Maybe the writer of this piece of propaganda didn’t want her name to be associated with such a piece of trash. I thought Tyler Hamilton (energy writer) could spew some garbage, but Ms. Gillespie has given Mr. Hamilton a new low to strive for.

SAVE THE PLANET-CUT LESS TREES-

CANCEL YOUR SUBSCRIPTION TODAY!

EDITORIAL TheStar.com | Opinion | Windmills vs. NIMBYism
Oct 20, 2008 04:30 AM – By Kerry Gillespie

After three years of effort, a $300 million wind farm that would have brought green power to Ontario has been cancelled. This is the latest casualty of a provincial planning process that just isn’t up to the task of ensuring that the best interests of all Ontarians prevail.

I guess the people forced from their homes and those living in misery because of wind turbines, don’t count in Ms. Gillespie’s Ontario.(added)


The province wants the clean energy that comes from projects like wind turbines. So much so that Energy Minister George Smitherman sent a $60 billion plan on how to meet the province’s electricity needs for the next two decades back to the drawing board to get more renewable energy and conservation into the mix.

According to the senior policy adviser I talked to – 10 billion spent on a real electrical system, would have provided Ontario with cost effective, clean, affordable electricity. He says we are dealing with politics. Try running your home or business on politics. At least 50 billion will be unnecessarily wasted ,causing your electric bill to skyrocket, and driving business from the province.(added)

Yet time and time again wind farms and other environmentally worthy projects run into the wall that is Ontario’s outdated, drawn-out planning process. Some manage to make it through. The wind farm planned for a township near Goderich didn’t.

The delays in getting through the process are difficult enough – often amounting to millions of wasted dollars – but the real problem comes when someone, and there’s always someone, wants to oppose the project. The NIMBYists are able to use the myriad planning steps – rezoning, official plan amendment, council approval, provincial environmental assessment and the spectre of an appeal to the Ontario Municipal Board – as weapons in their fight.

As a spokesperson for the doomed Goderich wind farm said: “We’re a very conservative province, so it’s difficult to put anything anywhere.”

It’s not just wind farms the NIMBYists fight. They also oppose traditional generating stations. That forces Ontario to buy expensive – and often dirty – power from elsewhere.

And they fight urban “intensification” in the form of highrise buildings, which help curb sprawl.

In some European jurisdictions, municipalities are given the right to say where wind turbines can’t go. But they also have to say where they can go. In Ontario, it’s simply too easy to say no and hope to delay the project long enough that the developers give up and decide to give it a try in someone else’s backyard.

According to a  councilor involved in the Kingsbridge ll wind farm, he was told that any setback over 450 meters would not be tolerated. He was told to pass the setback or the township would be taken to the OMB and that the township would lose, costing the township $100,000. This, dispite the fact Kingsbridge l at 450 meters had already caused major problems for people living in the shadows of the turbines.(added)

The energy minister is right to call for more renewable energy. Now the provincial government must make sure its planning processes support that goal, even if it means someone may have to gaze upon a windmill from the living room window.

Because reality and truth no longer matter to the Toronto Star, I ask that you show your disapproval by boycotting the paper. Until they understand their duty to the public (seek and print the truth) they do not deserve your support.  I will be making a formal complaint to

Bureau of Accuracy/Public Editor

You can contact the Star’s Bureau of Accuracy and Public Editor by email at publiced@thestar.ca; by phone at 416-869-4949; or by fax at 416-869-4322

To cancel your subscription or to let the Star know how you feel –(added)Customer Service (including subscription inquiries, delivery issues, billing inquiries, vacation stops or other customer service inquiries or complaints)
Email: circmail@thestar.ca
Phone: 416-367-4500 or 1-800-268-9213

TheStar.com

Windmills vs. Nimbyism (another take on the article above)

Wind turbines cause health problems, residents say – CTV News

OPTIONS FOR COAL-FIRED POWER PLANTS IN ONTARIO

Premier, Dalton McGuinty Talks About Renewable Energy For Ontario

Homeowners living near windfarms see property values plummet

Is Nimby the new “N” Word

EPCOR and the Ontario Power Authority mutually agree to terminate Kingsbridge II contract

October 15, 2008
Suncor wind farm Ripley

Embridge wind farm Kincardine

CTV News did a story on health problems associated with wind farms. Ernie Marshall moved from his home at the Kingsbridge l wind farm after suffering health problems. I would like to think this had something to do with Epcor’s  decision not to go ahead with the second phase of the project. A corporation with a heart?

Wind turbines cause health problems, residents say – CTV News

TORONTO and GODERICH, ON, Oct. 15 /CNW/ – EPCOR Utilities Inc. (EPCOR) announced today that the company and the Ontario Power Authority (OPA) have mutually agreed to terminate the renewable energy supply agreement for EPCOR’s 160 megawatt Kingsbridge II wind project in the Township of Ashfield-Colborne-Wawanosh.

The Kingsbridge II project was selected through a Request for Proposals
(RFP) process in November 2005, and a Power Purchase Agreement (PPA) for output from the project was signed on November 21, 2005. The PPA required the project to be in service by October 31, 2008.

EPCOR experienced delays obtaining provincial and municipal approvals forthe project, and uncertainty respecting regulations concerning the project’s layout, design, and testing. As a result, EPCOR would be unable to meet the contracts conditions as a result of circumstances beyond its control. EPCOR has decided in cooperation with the OPA that it will not proceed with this project as originally planned. EPCOR will not incur any asset write-downs associated with this decision.

Source CNW Group

Wind power was useless in blackout

June 1, 2008

Editor:
Another example of the importance of wind energy.

The Ont. govt. is a regular visitor to this site and should have learned something by now. I’ve come to the conclusion they suffer from one of the following.

1) They can’t comprehend what they read.

2) They are stupid and suffer from very low IQs.

3) They are evil traitors and are following the UN – New World Order Agenda.

Which one do you think it is?

With these fools at the helm, it is easy to understand why our Health Care, Education, Agriculture and Manufacturing sectors are in such disarray.

Isn’t the only hope for the planet that the
industrialized civilizations collapse?
Isn’t it our responsiblity to bring that about
?”
Maurice Strong, former Secretary General of UNEP

Read Agenda 21
Now!

.

Wind power was useless in blackout

The British Wind Energy Association claims that there are more than 2,000 turbines in the UK with an installed capacity of 2,500 megawatts. Where was all this megawattage when it was needed on Tuesday, when 500,000 homes were blacked out as Sizewell B and eight other power stations shut down?

The answer is simple: the 2,000 turbines were impotent and would have made the situation worse had the grid operators tried to feed in their spurious outputs.

Coincidentally, Government figures describing the CO2 savings achieved in 2007 show no contribution from wind. The wind industry received nearly £320 million during 2007 in subsidies — from us, the consumers.

A letter by Bob Graham, Inchberry, Morayshire to the Telegraph

1 June 2008

Wind Turbine Noise Video – Suncor Wind Farm Ripley Ont.

May 13, 2008

Update:
Both Suncor and the Ontario govt. have viewed this video. They have yet to respond. Not a big surprise.

Video I took at the Suncor wind farm Ripley Ont. The Ontario govt. continues to put the health of citizens at risk. The industry and the govt. say wind turbines are whisper quiet. You be the judge

Disturbing wind brewing

May 8, 2008

Editor:
First, I would like to thank the The Chatham Daily News for printing this story.

Nowhere on the planet has industrial wind energy proved it’s claims. Dalton McGuinty, our esteemed Premier, calls  wind energy  expensive and unreliable. What does that statement infer. To me it says, he is not in charge, but is in fact taking orders. A little research on your part will verify what I have said.

The wind industry is part of the E8 which is about the internationalization of energy. The wind farms are carbon credit creators. They have no other purpose.

I have worked with the people and councilors involved with the Kingsbridge l wind farm for over a year. Kingsbridge l one has been a source of noise, flicker and stray voltage problems since it began operation. One family that has just moved says they are now, after 2 years, finally enjoying a full nights sleep. The nearest turbine to their home was approx. 550 meters.

They have just passed Kingsbridge ll with a setback of 450 meters. Now, if your thinking, wait a minute, if people at 550 meters are having problems then why would they make a setback of only 450 meters.

According to a councilor, at the re-zoning meeting Apr.17th.,  they were told  by lawyers and govt. any setback over 450 meters would prompt an OMB hearing costing the township $100,000 and the township would lose.

Dwight Duncan is on record saying the govt. doesn’t want to force anything on anyone. The truth is exactly the opposite.

The wind industry with the backing of the govt. is picking off small municipal councils one at at time with lies and threats. This should be of grave concern to all citizens in the province.

The old saying “United we stand divided we fall” needs to instituted by all councils in Ont. Until a coalition of councils is formed and it stands united the “wind scourge” will continue unabated.

You, as councilors, were elected to look out for the best interests of your constituents and the community. Too often I have heard to same lame excuses. (1- they will take us to an OMB hearing. (2- we don’t have the resources to fight this.

If you are a councilor and you agree with the above statements, please resign immediately.  Otherwise, educate  your constituents about the fraud that is taking place. It is your duty. As long as you, the council, try and separate yourself from your constituents, the “wind scourge” will continue its unrelenting march across this Province, laying ruin upon the lives and property values of the very people you were elected to protect.  Embrace those who voted for you, tell them the truth.  Get the people on  side through truthful education.

I recently had a comment sent to this blog from a family living at the Ripley wind farm. They are saying that they and their neighbours are suffering from sleep disturbances caused by the noise emitted from the wind turbines and feel their health has deteriorated in the last five months since the arrival of the wind farm. The nearest turbine to their home is 808 meters. If these people are suffering at 808 meters, how can a setback of 450 meters be justified? It can’t.

There is more than ample evidence that the turbines are being sited too close to homes.

The wind industry and the govt. continually saying there is no “ABSOLUTE” proof of these health issues should be a wake up call to everyone. Denial has always been one of the favorite tools of both govt. and big business.

The wind industry is a fraud and the govt. is complicit (choosing to be involved in an illegal or questionable act, esp. with others; having complicity.) The govt. knows that wind (1- does not have the ability to keep the lights on in Ont. (2- wind is not capable of substantially cutting C02 emissions. (3- wind cannot continually power anywhere near the number of homes the industry and govt. claim.

Yet, these are all things being promoted by both the wind industry and the govt.

I always invite the govt. to look at this blog to make sure it is accurate and to let me know if there is anything they think needs to be changed. Govt. agencies visit this blog quite often. So far there have been no requests for any changes.

We try very hard to be as accurate as possible.

Note: The number of visits from K12 schools colleges and universities is  growing daily. The idea that Global warming is a fraud is being accepted by more people everyday. People will find the truth, even when the media works to hide it. Once you wrap your mind around the global warming fraud, you can ask, why are we destroying rural Ont. with wind turbines. Why?

Do your own research

Disturbing wind brewing

An article written in response to articles published in The Chatham Daily News April 15, “Gengrowth wind turbines approved,” and April 17, “Open house held, another wind farm project proposed.”

Don Quixote, in Cervantes’ classic by the same name, gallantly road off on his faithful steed, to slay the haunting, implacable, and ever-present giant — the windmill. Poor Quixote didn’t have a chance.

Concerned residents of Chatham-Kent feel the same frustration as independent companies, such as Gengrowth, and now Calgary based BowArk Energy Ltd. and Windsor-based Wind Prospect Inc. are proposing to add another 50 turbines to the 20 already approved by the Council of Chatham-Kent. Montreal based Kruger Energy is putting up 44 turbines near Port Alma. The windy invasion has just begun.

Many other wind energy companies are lining up with the direction and view to make Chatham-Kent a grid of hulking windmill giants and an eco-industrial park. It is a fast blowing wind. Not only, wind farm projects, but also the token and obligatory information nights cropping up all over the municipality. Interestingly, the information nights follow in the wake of deals cut by turbine developers and individual landowners prior to consultation with the public and a seemingly complicit council. This council represents taxpayers, and has an elected responsibility to protect the municipality’s most important natural, cultural and economic assets. Agricultural land, hundreds of acres, will ultimately be taken out of production. We have a unique fragile ecosystem including Rondeau Provincial Park and conservancy lands. Lake Erie is one of our greatest natural assets, tourist/vacation attractions, and cultural gems. Then there are heritage properties including, the historic Talbot Trail. Community and cultural identity is based on its natural assets and historical roots.

Gengrowth wind turbines are to be situated in a great monotonous line along the historic Talbot Trail, through Palmyra, Morpeth, and stretching out along the shores of Lake Erie. It is hard to imagine that in 2008, precious land bordering beautiful natural beaches and cliffs of Lake Erie will be dotted with giant wind turbines sweeping the countryside.

This is only one of many lines and grids that will weave through, connect, and wind around heritage and cultural landmarks while fencing in small towns and fencing out the natural beauty of rural Chatham-Kent.

While looking up, through and around these hunkering giants, one has to wonder what benefits they bring to Chatham-Kent and surrounding communities. It is interesting to note that some communities, like Leamington, have succeeded in stopping the spread of this invasion. Obviously, with the exception of the landowners who have generously allowed acreage to be taken out of production, very little is said about the economic and employment benefits to the trusting, green-friendly citizens of Chatham-Kent. While the public is assured that “Turbines have a significantly smaller impact on birds and bats than the dangers posed by high-rise buildings, predators or climate change.” What, perhaps, is being ignored is that this area is unique and fragile because it attracts an abundance of unusual bird species, and as a result is considered a Mecca for bird watchers and campers. The impact of turbines and its effect on a distinct and fragile eco system have not been studied to the fullest extent due to the fact that an independent environmental study has not been undertaken or supported by municipal council. Nor has a consultation with the Heritage Committee been initiated by council prior to granting permission to Gengrowth.

Like Quixote, one cannot help but feel an unsettling and disturbing ill wind brewing. While some residents of this municipality embrace wind turbines as a welcome and renewable energy alternative, others find it more prudent to consider the cost and long-lasting effects. The “not in my backyard mentality” is, admittedly, too often a selfish and a shortsighted response. This backyard, however, is species rich, agriculturally fertile and it comes with an enviable historical and cultural legacy.

Hopefully, there are a few Don Quixotes left. It is important and necessary to fight against the smiling giants of profit and opportunity whose false promises of economic benefits are, in this opinion, full of hot air and come at a great expense. It is time to demand that both the provincial and municipal governments preserve the heritage, and unique cultural and natural assets of Chatham-Kent. It is time to “tilt at windmills.”

Patricia Pook

Ridgetown

The Chatham Daily News

8 May 2008

Turbines Meet Ontario Noise Guidlines

April 30, 2008

.Dust-up over wind farms

Source the Toronto Sun

Report: Noise from turbines meet guidelines

By JONATHAN JENKINS, QUEEN’S PARK BUREAU

There’s no scientific proof wind turbines make disturbing levels of noise and, although more study is needed, Ontario’s guidelines are sound, a long-awaited consultant’s report for the ministry of the environment says.

The report by Ryerson prof Dr. Ramani Ramakrishnan was finished in December 2007 but was only posted on the government’s Environmental Registry website on Monday.

It reviews the work of a Dutch scientist, Dr. G.P. Van Den Berg, who found that 98-metre tall turbines at a German wind farm near the Dutch border made more — and more annoying — noise at night than expected. The report has been heralded by groups opposing wind farm projects near their homes.

“(Van Den Berg’s) dissertation was to provide scientific evidence for increased annoyance from wind farms during evening and night time hours,” Ramakrishnan wrote. “The review showed the above was not the case.

“One of the main criticisms of the doctoral dissertation of Van Den Berg is that the conjectures of his research have not been supported by solid scientific data.”

The Dutch study should be used as a catalyst for further work, though, Ramakrishnan said.

Holland has accepted the findings of Dr. G.P. Van Den Berg.

Hiring someone to trash Dr. G.P. Van Den Berg to further the wind scourge, shows the lack of integrity of both the govt. and the wind industry.

I experienced the Dr. G.P. Van Den Berg theory personally at the Kingsbridge l wind farm. It was early Oct of last year. I returned to the home of Ernie Marshall, after attending an all candidates meeting, to pick up my car. Beautiful fall evening, no wind at ground level but the wind at hub height was still strong enough to turn the turbine blades. How loud was the noise? Throw a pair of work boots in the dryer and turn it on. Go get your pillow, curl up beside the dryer. Sleep well. That in essence is the findings of Dr. G.P. Van Den Berg. (added) RS

Mr. Marshall and his wife have since moved out of their home. Mr. Marshall says his health is getting better and he and his wife now enjoy uninterrupted sleep at night. (added) RS

His report also found Ontario’s noise guidelines for wind turbines are reasonable and strike a balance “between noise impact and the need for wind farms, based on currently available scientific data.”

What the hell does that statement mean. Noise impact! The wind industry is promoted as whisper quiet. The need for wind farms? What need? The only thing that wind farms can hope to offer the people of Ontario is an unstable, unnecessarily expensive electrical system. (added) RS

Kate Jordan, a spokesman for the ministry of environment, said the report, held back from December, was being posted on the Environmental Registry for 30 days to allow the public to comment on it. “We wanted to make sure it was the final report. We needed to know it was complete,” Jordan said of the late release.

The report has found what the industry has believed for some time, Sean Whittaker, vice-president of policy for the Canadian Wind Energy Association, said.

“The report does confirm that the findings of Van Den Berg are put into question,” Whittaker said.

“CANWEA has been confident that the noise guidelines we have here in Ontario are very good.”

Ontario has about 500 megawatts of Canada’s 1,856 megawatts of wind power. CANWEA wind projects could rise to as much as 4,600 by 2020.

Ron Mattmer, who lives a kilometre from a proposed wind development in Kincardine, says he supports wind power but is opposed to locating them so close to homes.

He said the ministry is “in denial” about Van Den Berg’s noise findings and have “jiggered” their own limits to ease development.

Source the Toronto Sun
.
Comment By Ron Stephens

“CANWEA has been confident that the noise guidelines we have here in Ontario are very good.”

They are confident because they were instrumental in the formation of those guidelines.

I remember Ford claiming the PINTO didn’t blow up. Big Pharma is always getting the FDA to pass drugs that end up hurting or killing people.

Industry policing its self, with govt. pushing the bull down the taxpayers throat. Neo-Liberalism at it’s worst. Never underestimate the power of denial, especially when govt. is on the side of industry.

Here is an email I just received the other day.

Maybe the wind industry or the govt. could comment .

I live 808m from a Enercon 82 wind turbine and within a km. of 11 other turbines at the Ripley Suncor/Acceon wind project. My health and the health of my neighbours has deteriorated over the past 5 months. We hear a constant roaring of jets 24/7 and at night when the house is quiet there is a CONSTANT HUMMING which going right through your head no matter what you try to do occurs. We have had many meetings but the humming still goes on and we are still waken 2-??? times/night. We do NOT get a deep sleep.

But of course this person must be complaining because 1- they like to complain 2- they didn’t make any money on the deal 3- they must be crazy 4- they work for or are being paid by the fossil fuel industry 5- they hate Mother Earth.

This govt. and the wind industry are so full of crap it is ridiculous. This scam is no different than the door to door reno scams. Promise a lot and never let the truth get in the way.

The wind industry and the govt., here in Ontario, claimed they could greatly reduce emissions. Lets see the peer reviewed results. Why aren’t the papers full of the results the wind industry claims? They don’t exist, not through my research. If they do, lets see them.

Bird and Bat kills too small to worry about. Then why the deal to hide the results from the public.

Noise – the turbines are whisper quiet, about as much noise as your fridge they said. Then why are people being forced from their homes.

A doctor from Kingston stated that the health problems created by wind turbines are only temporary and a persons health will return once they no longer live near the turbines. If that doesn’t sound the alarm bells what will?

This is a CRIME against the citizens of the Province of Ontario.

Explain this CanWEA and the McGuinty govt. of Shame

Reaction to the Scottish Government’s refusal to construct one of Europe’s largest onshore wind farms, 181 turbines on Lewis in the Western Isles , has exposed the myth of wind power.

In response to Scottish industry’s concerns that its lights may go out, Britain’s power industry had to admit it would not make one iota of difference as wind power is too unstable to be included in any calculations of how much power is needed to satisfy the country’s needs – whether or not the wind is blowing our power stations will still burn the same amount of fossil fuel.

A spinning turbine’s only value, for the environmentalists, is as an icon of their power over the vulnerable and as an “at least we are doing something” comfort blanket for gullible politicians, plus, of course, an exponential currency generator for the wind industry. full article here


Never forget – Enron started the wind scam. Enron is gone but the scam lives on. Google Enron, Maurice Strong and Al Gore. Maybe that will open your eyes.

The govt. should have put the scrubbers on the coal plants and built a new nuke. Cost approx. 10 billion. Cost for wind, solar, gas plants, new transmission lines and a new nuke, 60-70 billion. Think what that extra money could have done for Health Care, Education and our Farmers

Read Agenda 21. It’s about a lot more than just the wind industry.

Note: I, unlike Mr. Mattmer, do not support wind power as presented.

“Ron Mattmer, who lives a kilometer from a proposed wind development in Kincardine, says he supports wind power but is opposed to locating them so close to homes.” (found in Toronto Sun article above)

I do however, support Mr. Mattmer, and all the other people in Ontario who have worked so tirelessly to expose the truth. Please join us in the fight for truth and Democracy.

If the govt. is serious about the environment they would be putting the money into grants to retrofit homes and encourage home solar and wind. This would reduce the need for new generation and save money in the process. After all, it’s your tax dollars subsidizing the wind industry of which the only “benefit ” to you will be higher electrical costs.
The wind industry on the other hand will make a fortune.

I think it is time for an open televised debate – maybe on TVO. I, and many others, including engineers, are available, and look forward to such a debate. The govt. and the wind industry debating with citizens of Ontario. Sounds like democracy to me.

What is going on now is about as anti-democratic as it gets.

Councils are told to pass the wind farms or they will be taken to an OMB hearing at a cost of approx. $100,000. and they are told they will lose, and God forbid-they will look anti-green. Did I mention the “GREENS” are pagan based and anti-Christian. Ever wonder why Mr. McGuitny wants to remove the Lords prayer from the Legislature?

Kingsbridge l has been a source of noise, flicker and stray voltage complaints for the two years it has been operating. People and animals suffer up to a kilometer away, yet no health study. The setback for Kingsbridge ll 450 meters.

Criminal

Turn off the TV, put down the newspapers and do your own research. Get the family involved. Think often and think critically.

Democracy is not a right. When a democracy is not guarded, protected and demanded by its citizens it will be lost. That day is getting very close.

RS

Ron Stephens ran as an Independent candidate for Huron-Bruce in support of those suffering from wind turbine nuisance and he continues to fight for their rights.

Editor:
Once again, I ask both the govt. and the wind industry to look over this blog and if you find something you can prove is not correct let me know and the appropriate corrections will be made.

Update- Fri. May 1st – 9:30 am
Someone from the govt. of Ont. and Suncor have read this post. Site Tracker stats

Reeve outraged by MPP’s comments

December 12, 2007

Editor
It’s about time the Reeve gets outraged at Carol Mitchell and the McGuinty Govt. Carol Mitchell and the Liberal govt. lied to the people of ACW from the outset and continue to do so. After all the problems with Kingsbridge l, does the Reeve finally have the backbone to tell Mitchell and her lying co-conspirators to piss off once and for all.
carol2.jpg Carol Mitchell thinks that everything David Suzuki says is true. Isn’t that right Carol. Carol, you are just another Suzuki Sheep. Suzuki is a fraud,
Suzuki Says “Sorry, intelligence was never my strong suit.”
and so are you and your Liberal bandits. Lose the smile and hang your head in shame for what you are doing to this province.

Ashfield-Colborne-Wawanosh Township Reeve Ben Van Diepenbeek is outraged at comments by
Huron-Bruce MPP Carol Mitchell

By Sara Bender
Signal-Star Publishing
Wednesday December 12, 2007

Ashfield-Colborne-Wawanosh Township Reeve Ben Van Diepenbeek is outraged at comments by Huron-Bruce MPP Carol Mitchell regarding the township’s wind turbine setbacks.
Mitchell made comments last week on FM 101.7 radio stating that the township is “dragging their feet” by not passing their wind turbine bylaw. She said “the township should move so the Kingsbridge II wind project can begin.”
Firstly, Van Diepenbeek said the township is not passing a wind turbine bylaw but rather a consolidated bylaw for the three wards. He said the township’s consolidated bylaw is not ready to proceed yet and will still have to go through a public process before it can be passed.
“We are not going to pass one part of the bylaw now; we want all of the consolidated bylaw complete,” he said. Van Diepenbeek said Mitchell should know that it is not the township “dragging their feet” but the Ministry of Environment. He said Mitchell was with council when they met the minister several months ago and they have been waiting for information since then so they could move forward.

Globalization : Policy Regime Changes
Complete Restructuring of Energy Sector
PEmerging global energy (and infrastructure)
transnationals that can work within and between
global regions (Hydro Quebec,Enron, others)
P Postwar utility: vertically integrated monopoly
(VIM) : energy production, transmission and
distribution in one firm P Neoliberal idea: divide VIM into different functionally specialized firms
P New functionally specialized firms form an energy sector that is integrated by a market
P All firms/markets within energy sector would need arms length regulation
P New organization provides opportunity structures for transnational investmentGlobalization Electrical Energy

Goderich Signal Star
ACW Council waits for wind word from ministry-Update

Posted on September 6, 2007.

EPCOR is not responding to the public’s concerns.

Posted on January 27, 2007.

Wind Turbine Setbacks-UPDATE Sept.11 2007-

Posted on January 25, 2007.

Best slogan gets a Free Coffee

Posted on January 7, 2007.

Kirby Mountain: U.K. Noise Association: 1 mile setback needed for wind turbines

Posted on December 2, 2006.

 

 

 

 

ACW Council waits for wind word from ministry-Update

September 6, 2007

From the editor:

We need more men and women with the backbone and conviction of Councilor
Barry Millian

 

I got involved with the wind farm issue in Oct. 2006. The Kingsbridge l wind farm started operation in the spring of that year in the Twp. of Ashfield-Colborne-Wawanosh. I had no intention of getting involved. I did like a lot of others, I drove by the wind farm in Oct. and my first reaction was that it didn’t directly affect me so don’t worry about it. What made me stop at several farms to see how the people were dealing with the wind farm, I’m not entirely sure. What I found was good honest people, that have been lied to and have had both their lives and property values ruined.

Epcor who built the Kingsbridge l wanted to build Kingsbridge ll even though there were many problems with No. l. The council wanted to give the go ahead with no regard for the people who were already experiencing problems.

I and several others trying to find the truth about wind farms were told by frustrated residents from ACW to contact Councilor Barry Millian. We were told that he was the only one who seemed interested in making sure the residents were protected from adverse effects that might be caused by putting the turbines too close to homes.

We sent Mr. Millian volumes of information on the subject of which he studied. The G.P. van den Berg: “Effects of the wind profile at night is one paper he paid close attention too and it showed why the people living near the wind farm were having problems sleeping at night.

Councilor Millian who under intense pressure to allow Kingsbridge ll to proceed, stood his ground and convinced the council to wait until they got an answer from the ministry with regards to the G.P. van den Berg Report.

They were promised an answer by the end of Feb. 2007. They still do not have an answer to date. It is now promised sometime in Oct., after the Provincial election.

If the govt. acknowledges the G.P. van den Berg Report they will not be able to put the turbines as close to homes as they are.

It appears the govt. is sitting on the report trying to put through as many wind farms as they can before they get caught.

The OMB hearings are a farce when the govt. is withholding information that would force the turbines to be much further from homes.

Was the Enbridge 110 turbine wind farm near Kincardine passed because information was withheld by the govt.?

I asked Marie LeGrow, senior project coordinator for the MOE, how they could go ahead with the OMB hearing for the Enbridge wind farm when they hadn’t completed the study on the G.P. van den Berg Report. I was told that because the Enbridge wind farm was already in process, the report regardless of the outcome, would not affect the Enbridge project

Below is the story from The Goderich Signal-Star

Ashfield-Colborne-Wawanosh Twp. council will not pass its new comprehensive zoning bylaw until the Ministry of Environment responds to the township’s concerns about wind turbines.

At the Aug. 21 meeting, council was to set a date to review comments and changes to the comprehensive zoning bylaw with the planning department. However, Counc. Barry Millian said council should not rush passing the bylaw until the township gets answers back from the ministry following their meeting on July 30 at the Huron County council chambers.

“The minister said she will get back to us in October and we’ve waited this long, why not wait another month?” asked Millian.

Township resident Harry Kerr said the wind turbines neighbouring his property are more than 800 metres away but “damn noisy”.

“The 400 metre setback is not enough,” said Kerr.

Millian urged all council members to study the reports on the wind turbines.

“Nobody is going to disagree with the Ontario government saying that there is a need for renewable energy but we don’t know anything about it and the government just wants us to do it,” said Millian. “We can’t talk to anyone in Ontario about this because it’s new and no one knows anything about it and I challenge anyone in this room to argue with me about this.”

Council agreed to wait for the minister’s response.

By Sara Bender

The Goderich Signal-Star

5 September 2007

We need more men and women with the backbone and conviction of Councilor
Barry Millian

You’re a good man