Archive for the ‘Provincial election’ Category

Energy Policy is a Disaster for Ontario

October 8, 2007

Energy is pretty straightforward until politics is allowed to become involved.

According to the senior policy advisor of the Ministry of Energy $15 billion will give Ont. a clean stable cost effective electrical system. Add politics and the cost becomes $70 billion. Our electrical system must be put back in the hands of the people who know what they are doing. Our electrical rates will rise between 40%and 70%, driving away manufacturing jobs.

Both the Liberal and Conservatives are under the illusion that filling Ont. with wind farms will equate to lower emissions. The World Energy Council states that renewable energy such as wind can raise emission levels.

Advertisements

Health Care in Huron Bruce Gets a Failing Grade

October 8, 2007

 by Ron Stephens

The percentage of people in Huron Bruce without a family doctor remains at unacceptable levels. Why?

Both the Liberal and Conservative parties want to introduce private health care. Starve the system long enough and pretty soon private health care starts to look good.

If you want good health care you must demand it. Competing against each other for doctors by attempting to bribe them is demeaning for both the communities and the doctors, It is also a losers game. The solution I have come up with is very simple. Fast track the foreign doctors already in the province but not practicing, they are assigned a community and paid on a graduated scale until they reach full pay at the end of five years. With any luck they have become a part of the community and are happy to continue to live and practice in their new home town. It is important that people entering medical school are screened so that the ones who put health care ahead of money get the positions in the schools. Those doctors will be less likely to leave to chase the money. The doctors must be well paid, but money should not be their first priority.

Our health care system will never work if the powers that be continue to be allowed undermine it.

Your Tax Dollars at Work

September 10, 2007

sygration-ontario-generator-report_1189453848609.png

Sept.10th output from the wind farms in Ontario. We have almost 400 MW of installed capacity in Ont. The govt. and the media keep telling you about all the homes wind will power. They are lying to you.

The graph starts at 1am. 10% production would be about 40MW, not much to brag about but today they are not even close to 10%. In fact at 10 and 11am they produced nothing.

Close the nukes and close the coal plants and invest in candles. Buy lots before the price goes up.

If you still think wind power works maybe you could explain it to the rest of us.

While you worry about Global Warming the “BIG BOYS” are sitting in their air conditioned offices drinking very good scotch and probably enjoying a nice fat Cuban cigar laughing at YOU, wondering just how stupid the average person is.

Well, are you as stupid as they think you are?

wulfshagen04.gif

Dalton McGuinty Wants to Paint it Red

September 8, 2007

Paint it Red

Please check out the Liberal web site and see if you can find any reference to wind energy. I can’t.

Maybe they don’t mention it so no one will ask them any questions.

Even Dwight Duncan the Energy Minster who is going to devastate his own riding with wind farms doesn’t mention them.

I see they are going to name a school after David Suzuki. David is a Sheep Herder. If you are a SHEEP follow David and enroll your child in SHEEP SCHOOL. Sheep will save the world lol

Be sure not to disagree with David, he gets upset.
Even David doesn’t mention wind farms much anymore. He likes light bulbs better. Not many hard questions about light bulbs.

To the Liberal Party and David Suzuki

 

flick off
OFF

Paint it Red

visit the Liberal web site

wulfshagen04.jpg

This post is my lame attempt at humor.

I really do believe everything the Liberal Party-David Suzuki and Al Gore want me to believe and I think we should all be painted RED.

ACW Council waits for wind word from ministry-Update

September 6, 2007

From the editor:

We need more men and women with the backbone and conviction of Councilor
Barry Millian

 

I got involved with the wind farm issue in Oct. 2006. The Kingsbridge l wind farm started operation in the spring of that year in the Twp. of Ashfield-Colborne-Wawanosh. I had no intention of getting involved. I did like a lot of others, I drove by the wind farm in Oct. and my first reaction was that it didn’t directly affect me so don’t worry about it. What made me stop at several farms to see how the people were dealing with the wind farm, I’m not entirely sure. What I found was good honest people, that have been lied to and have had both their lives and property values ruined.

Epcor who built the Kingsbridge l wanted to build Kingsbridge ll even though there were many problems with No. l. The council wanted to give the go ahead with no regard for the people who were already experiencing problems.

I and several others trying to find the truth about wind farms were told by frustrated residents from ACW to contact Councilor Barry Millian. We were told that he was the only one who seemed interested in making sure the residents were protected from adverse effects that might be caused by putting the turbines too close to homes.

We sent Mr. Millian volumes of information on the subject of which he studied. The G.P. van den Berg: “Effects of the wind profile at night is one paper he paid close attention too and it showed why the people living near the wind farm were having problems sleeping at night.

Councilor Millian who under intense pressure to allow Kingsbridge ll to proceed, stood his ground and convinced the council to wait until they got an answer from the ministry with regards to the G.P. van den Berg Report.

They were promised an answer by the end of Feb. 2007. They still do not have an answer to date. It is now promised sometime in Oct., after the Provincial election.

If the govt. acknowledges the G.P. van den Berg Report they will not be able to put the turbines as close to homes as they are.

It appears the govt. is sitting on the report trying to put through as many wind farms as they can before they get caught.

The OMB hearings are a farce when the govt. is withholding information that would force the turbines to be much further from homes.

Was the Enbridge 110 turbine wind farm near Kincardine passed because information was withheld by the govt.?

I asked Marie LeGrow, senior project coordinator for the MOE, how they could go ahead with the OMB hearing for the Enbridge wind farm when they hadn’t completed the study on the G.P. van den Berg Report. I was told that because the Enbridge wind farm was already in process, the report regardless of the outcome, would not affect the Enbridge project

Below is the story from The Goderich Signal-Star

Ashfield-Colborne-Wawanosh Twp. council will not pass its new comprehensive zoning bylaw until the Ministry of Environment responds to the township’s concerns about wind turbines.

At the Aug. 21 meeting, council was to set a date to review comments and changes to the comprehensive zoning bylaw with the planning department. However, Counc. Barry Millian said council should not rush passing the bylaw until the township gets answers back from the ministry following their meeting on July 30 at the Huron County council chambers.

“The minister said she will get back to us in October and we’ve waited this long, why not wait another month?” asked Millian.

Township resident Harry Kerr said the wind turbines neighbouring his property are more than 800 metres away but “damn noisy”.

“The 400 metre setback is not enough,” said Kerr.

Millian urged all council members to study the reports on the wind turbines.

“Nobody is going to disagree with the Ontario government saying that there is a need for renewable energy but we don’t know anything about it and the government just wants us to do it,” said Millian. “We can’t talk to anyone in Ontario about this because it’s new and no one knows anything about it and I challenge anyone in this room to argue with me about this.”

Council agreed to wait for the minister’s response.

By Sara Bender

The Goderich Signal-Star

5 September 2007

We need more men and women with the backbone and conviction of Councilor
Barry Millian

You’re a good man

Energy plan calls for wind, nuclear

August 30, 2007

From the Editor:

Dalton and his band of fools are so ludicrous that after they get the boot on Oct. the 10th they might want to shop their time in power to the CBC as a comedy. It might be funny as a sitcom but it’s far from funny as reality.

Ever since deregulation our electrical grid has been a disaster.

Deregulation did not work to the benefit of the citizens of Ont. and needs to be rolled back.

So who you gonna vote for.

Dalton is a disaster.

John Tory wants to fill up the great lakes with windmills . Expensive and unworkable.

Howard Hampton wants to run the grid with wind and solar. Expensive and unworkable.

Why is Dofasco, Canada’s biggest and most profitable steelmaker going to coal? Because gas is way too expensive. What do these parties plan to use to back up the wind and solar? Gas. Watch your hydro bill soar like an eagle.

The people who should be looking after our electrical needs know and will tell you that the best option at this time is to put the scrubbers on the coal plants and build another nuke.

If you allow reality to enter your mind you will come to the same conclusion.

options-for-coal-fired-power-plants-in-Ontario

 

 

Coal-fired plants to be phased out by the end of 2014, but some will be kept operational for “insurance purposes” in case of an unexpected shortfall in power supply or unusually high demand. Read the entire new plan at the National Post

From the Editor:

Which is it Dalton or do you know. You told the people of Ont. that you would close the coal plants in 2007 then you said for sure in 2014. Now you say you will phase them out by the end of 2014 but at the same time you will keep them operational. Why? Just in case you don’t have a clue what you are talking about. Goodbye Dalton. Don’t let the door hit you in the ass on your way out the door.

Find your MPP here 

 

Read the story from the Sarnia Observer below

Liberals Reveal Easy Hypocrisy

The desperation shown by Dalton McGuinty’s Liberal government heading into the Oct. 10th provincial election reached new heights last week when it announced $6 million to help a Hamilton steel company replace natural gas with coal in its operations.

The Liberals, of course, are the same party that issued a legally binding regulation just days earlier to close Ontario’s four remaining coal-fired power plants by 2014, a move that spells the end of the Lambton Generating Station and 400 well-paid local jobs.

To cut operating costs, Dofasco is building a $60-million pulverized coal injection system to run two blast furnaces. By switching to coal from natural gas the Hamilton-based company expects to save about $28 million a year.

Dofasco is Canada’s biggest and most profitable steelmaker. Yet McGuinty still cuts the company a cheque for $6 million of taxpayer’s money, part of a pre-election spending blitz that has reached dizzying proportions.

Read the full story THE SARNIA OBSERVER (more…)

Bruce County to Get up to 3000 Turbines

July 28, 2007

From the Editor

Anything less than a complete moratorium on wind farms in Ontario is unacceptable. The corporations will smile at you while they take over rural Ontario. Heading full speed ahead back to “Feudal Times” where you are reduced to a Serf on the land you once owned and controlled.

Tell your Liberal MPP what you think.Serfdom is the socio-economic status of peasants under feudalism, and specifically relates to Manorialism. It was a condition of bondage or modified slavery seen primarily during the Middle Ages in Europe. Serfdom was the enforced labour of serfs on the fields of landowners, in return for protection and the right to work on their leased fields.

Serfdom involved work not only on fields, but various agriculture-related works, like forestry, transportation (both land and river-based), crafts and even in production. Manors formed the basic unit of society during this period, and both the lord and his serfs were bound legally, economically and socially. Serfs were labourers who were bound to the land; they formed the lowest social class of the feudal society. Serfs were also defined as people in whose labour landowners held property rights.

The Bruce County Federation of Agriculture is calling for measures to protect the county’s tourism industry, farming operations and municipalities from the rapidly developing wind energy industry.

“Recent studies in other countries have shown that large wind generating areas and tourism are not compatible. It would be a shame to lose the gains we have made in tourism by not having planning in place to make sure our tourism industry stays vibrant,” federation president Robert Emerson told Bruce County council’s agriculture, tourism and planning committee on Thursday.

The committee was looking at wind energy policy as part of the county’s five-year review of its official plan and because of concerns raised by residents and the industry over the lack of adequate regulations.

Committee members later approved 15 recommendation that chair Charlie Bagnato described as a beginning of more policies to regulate wind energy development.

The recommendations include one calling on developers to provide clearer information about shadow flicker and noise and a provision for a complaint protocol, so members of the public can make their concerns known to the developer and the county.

There was no proposal to change setbacks from built-up areas, which municipalities can set at anywhere from 400 to 700 metres. However, there were recommendations that the planning department conduct further research on the density of turbine development, cumulative impact of wind turbines in an area and the effect of cold weather on wind turbine operation.

Bagnato said more policies will be included once that information is received.

“The overall updates they made today will be helpful in the short term . . . but we’re suggesting now is the time to take a long-term view of the whole issue as it affects county tourism, county agriculture and we’re identifying some real important agricultural issues,” said Emerson.

Emerson held up the example of Grey Highlands, which has designated certain areas suitable for wind energy development and prohibits it in visually sensitive areas. It has incorporated those regulations into its official plan.

“This is fair to all concerned because then wind prospectors will know where they can develop their wind parks and farmers will know if their land is eligible for development,” Emerson said.

Saugeen Shores Mayor Mike Smith agreed with Emerson’s suggestion of looking into protecting natural and tourist attractions from wind energy development.

Chris LaForest, head of planning for Bruce County, noted the proposals by Grey Highlands still need approval by Grey County.

Emerson cautioned against rushing into new regulations to satisfy the demands of the wind energy industry. He noted the transmission capacity for new wind energy won’t be available until 2011 and the recent announcement of up to 3,000 megawatts of wind energy coming from Bruce County within the next 10 years would require between 1,500 and 3,000 wind turbines.

“Once these units are up and running . . . the citizens of Bruce County will be left to look at a wind park of industrial proportions for the rest of their lives,” Emerson warned.

Emerson also is concerned that wind turbines are not being fairly assessed. He worries that will result in municipalities collecting less in taxes.

Wind turbines are assessed by the Municipal Property Assessment Corporation at $40,000 for each megawatt of electricity they are rated to produce. The standard 1.5 megawatt turbine worth $2.5 million dollars is assessed at $60,000. A farming operation of the same value is assessed at $500,000.

“To me these large wind turbines have been given a sweet heart deal by the province . . . there’s no fair comparison at all to agriculture. We see it having a detrimental affect on the whole county assessment,” Emerson said.

LaForest said he sees the updates to the county official plan passed by councillors on Thursday as a first step to setting policy for wind energy. Final approval will takes place at a meeting of County council on Aug. 2.

By Don Crosby

The Sun Times

28 July 2007

Tell your Liberal MPP what you think.

Wind Turbine Setbacks-UPDATE Sept.11 2007-

January 25, 2007

From the editor

Manitoba gets the first realistic setback in Canada. The people in Manitoba fought back and instead of a 500 meter setback they now have a more realistic 2000 meter from their property lines. In Ontario the setbacks are from the residence, not the property line, which makes the 450 meter setback in the Municipality of Kincardine and most other places even more ludicrous and unacceptable. I would like to take this opportunity to encourage everyone everywhere to fight for their and their neighbors rights.

You don’t have to put up with this crap.

Rural Municipality of Cartier Manitoba
Some residents voiced their displeasure with the project at the public hearing. Rasmussen said most residents were concerned about the distance turbines would be located from property lines according to the zoning bylaw.

The bylaw passed first reading by a 5-1 council vote in June. Since then, set back guidelines for erecting the turbines changed from 500 metres from neighbouring property lines to 2,000 metres.

Read the rest of the story and get inspired

Riverside County-CALIFORNIA-Restrict the placement of wind turbines within 2 miles of residential development unless the applicant supplies documentation that the machine(s) will not produce low frequency impulsive noise.

Turbines too close to homes-Ms. Lucas, speaking for the Guardians, told the hearing commissioners that the 70 wind turbines proposed for the hills southwest of Makara, each 125 meters tall, were too large to put within two kilometers of any residence. International research showed it was “general protocol” to allow a 2km buffer, even with smaller turbines.

In NZ there were no consented wind energy developments with more than a handful of houses closer than 2km. (Source-Walkato Times)

Australia-To avoid adverse noise impacts on the amenity of the surrounding community, wind farm developments should include sufficient buffers or setbacks to noise sensitive premises. As a guide, the distance between the nearest turbine and a noise sensitive building not associated with the wind farm is to be 1km. These guidelines provide that wind farm developments should be constructed and designed to ensure that noise generated will not exceed 5dB(A) above the background sound level or 35dB(A) using a 10-minute LA eq, whichever is greater, at surrounding noise-sensitive premises. (Source-Guidelines for Wind Farm Development, Planning Bulletin, Western Australia)

Australia-Wind Farm Under Scrutiny. The Myponga/Sellicks Hill wind farm will be scrutinized after claims that developer TrustPower plans to move seven of the turbines within one kilometer of dwellings. (Source-The Times)

(1600 metres in Germany, 1800 metres in Holland).

It was Alves-Pereira’s initial research, published in numerous scientific journals, which prompted the French National Academy of Medicine, earlier this month (March 2006), to call on the French government to stop all wind turbine construction within 1.5 km of people’s homes. You should understand that VAD is well established in the clinical literature; it is not conjectured. It has been amply documented and is readily detected by a variety of diagnostic tests.

What’s wrong with Ontario Canada!

First, the relatively small size of private land parcels in Ontario will present a challenge for developers due to the number of stakeholders that may perceive impacts. Windpark development may become uneconomical if municipal setbacks created to address these “perceived” concerns reduce the usable land area, thus eliminating the economics of scale necessary to develop a project.*
*14c) The Industry does not recommend that a set of standard bylaws be adopted with respect to setbacks or other municipal zoning issues.*

*”The above can be understood to mean, that if “safe setbacks” are mandated, it will make it uneconomical to site wind farms in Southern Ontario”

Setbacks in Ashfield township 400 meters

Setbacks in Municipality of Kincardine 350 meters

“Ontario’s strict sound guidelines ensure that turbines are located far enough away from residences .” What Ontario guidelines? Every municipality is left to figure it out for themselves. Chatham Kent: 300 m, Amherstburg 600 m.

Meanwhile worldwide, in countries that have learned from their mistakes, these distances are increasing due to health, quality of life and safety issues (1600 metres in Germany, 1800 metres in Holland).

You should make people aware, Mr. Hornung that CanWEA is lobbying to remove setbacks altogether in southwestern Ontario due to the small land parcels.

 

Is the Ont. govt. ignoring health issues and the right of property enjoyment for economies of scale. That’s what it sounds like to me. The wind industry is always using the term “perceived” concerns. The concerns that people have are real not “perceived”.

Dalton and Duncan need a reality check. The rights of the people of Ont. are far more important than a bunch of useless windmills.

Germany has more windmills than anyone else. They are building 8 new coal plants because wind isn’t working for them. The Danes don’t want them either, their govt. is forcing them on their people. Why? They have 30.000 people working in the industry.

“We simply cannot continue to lead the world in the field of wind-power technology if we don’t even make room for wind parks in our own country,” Connie Hedegaard, the environment minister for Denmark said“.

Dalton and Dwight or Dumb and Dumber you be the judge